首页> 美国政府科技报告 >Technical Work Status Report and Drill Pipe Fatigue Test Machine Monthly Progress Report
【24h】

Technical Work Status Report and Drill Pipe Fatigue Test Machine Monthly Progress Report

机译:技术工作状态报告和钻杆疲劳试验机月度进度报告

获取原文

摘要

Minor modifications were made of the subcontract to design and procure an electric power sub. Finer detail was established for the specifications of the electrical equipment. Major effort in the design and construction of a full-scale drill pipe fatigue test machine was directed towards detail design of the rocker arm, the load link, and the installation of the roller bearings associated with these elements and those for the rocker arm supports and the pitman connection. Titanium drill pipe extrusion investigations consisted of preliminary experimental piercing, bare extrusion, steel jacketed extrusion, and copper jacketed extrusion on a 3,850-ton press in preparation for full-scale extrusion on an 8,000-ton press.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号