首页> 美国政府科技报告 >Methane Drainage Study Using an Underground Pipeline, Marianna Mine 58
【24h】

Methane Drainage Study Using an Underground Pipeline, Marianna Mine 58

机译:使用地下管道进行甲烷排水研究,marianna mine 58

获取原文

摘要

The Bureau of Mines has completed an underground degasification project in which an underground piping system was used to transport methane from the coalbed to the surface. In a 10-month period four horizontal holes were drilled to an average depth of 1,450 feet. All four holes were surveyed vertically and azimuthally. In 991 days of degasification, 255 MMcf of gas was drained from the coalbed. The underground piping system proved to be a safe and effective means of transporting methane from the coalbed to the surface.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号