首页> 美国政府科技报告 >Validation of Track Geometry Input to the Vibration Test Unit (VTU) and Endurance Capability of the VTU
【24h】

Validation of Track Geometry Input to the Vibration Test Unit (VTU) and Endurance Capability of the VTU

机译:验证轨道几何输入到振动测试单元(VTU)和VTU的耐久性能力

获取原文

摘要

This report describes a series of tests conducted at the Transportation Test Center, Pueblo, Colorado, to validate two forms of track geometry inputs to the Vibration Test Unit (VTU) in the Rail Dynamics Laboratory, capable of reproducing actual revenue track conditions. The first form consisted of reformatted Plasser geometry input produced by converting the Plasser mid-chord offset data into a Space Curve format with a special software. The second track geometry input was developed based on the Locomotive Track Hazard Detector (LTHD) concept, and was produced by processing the time histories of special axle-mounted accelerometers into a space curve format. After the identification of a suitable form of input to the VTU which closely duplicated actual track conditions, a series of endurance cycle test runs was performed to demonstrate the capability of the VTU to operate for sustained periods of time using the track geometry as the input excitation.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号