Aligning Oversize/Overweight Permit Fees with Agency Costs: Critical Issues.

机译:将超大/超重许可费与代理成本对齐:关键问题。

获取原文

摘要

This project provides an elementary analysis of issues and a proposed framework for the state to evaluate cost recovery options due to OSOW operations. The authors provide a review of current permitting practices, provide a sampling of fee structures, and outline preliminary trends for OSOW demand in the foreseeable future. The basis for the project is the Midwest States, but the findings incorporate national trends and data as appropriate. The research team surveyed state DOTs for information on permit fee structures and the respective distribution and allocation of permit revenue. The research team did not attempt to determine roadway, infrastructure, and other impacts of OSOW loads, but rather document studies that attempt to monetize these values and provide observations. A methodology is proposed to generate said costs, but the validation of such methodology was outside the scope of this study. Finally the project report details other considerations, including truck-to-rail diversion potential if permit fees are increased. A series of best practices is provided to help guide the operations of a permitting process. The research team concludes that permit fees likely cannot recover the costs of issuance, however, in many agencies the permit fee is not designed to be a cost recovery mechanism. This is magnified in the multitrip permitting processes available in most states. The authors do not make a specific recommendation for agencies with respect to permit fee determination.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号