Report on the Appropriateness of the Lishu Wollastonite Mine, Phase 2 Expansion Project (Jilin, People's Republic of China) for Feasibility Study Funding.

机译:关于丽水硅灰石矿二期扩建项目(吉林,中华人民共和国)可行性研究资金的适宜性报告。

获取原文

摘要

The Lishu Wollastonite Mine Phase II Expansion Project is technically, economically and financially feasible. The definitional team estimates the overall cost of the project at between US $11 and 13 million. This includes only US $3 million in hard currency, which the definitional team believes is not adequate for the optimum level of imported equipment and engineering services. The project will require a minimum of US $3.03 million-worth of imported goods and services. Approximately $8 million is the maximum estimated for imports. U.S. companies will be in a strong position to supply all imports for the project, but will face competition from Japanese equipment suppliers. The definitional team concludes that the Lishu Wollastonite Mine Phase II Expansion Project merits an Equipment Selection and Plant Design Study, and recommends it for US Trade and Development Program (TDP) support.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号