首页> 美国政府科技报告 >Production Scheduling of Annealing Furnaces
【24h】

Production Scheduling of Annealing Furnaces

机译:退火炉生产调度

获取原文

摘要

The development of a computerized procedure for optimal scheduling of steel coils in a batch annealing furnace is reported. The batch annealing process is accomplished by placing the coils in a portable-cover furnace during the heating and cooling cycle. The number of coils that can be stacked on a base is limited by the height of the furnace. The objective is to generate the stacks so as to maximize the throughput which is measured in terms of tons processed per hour. Chapter 1 mentions the scope of the report and gives a brief description of the batch annealing environment. Chapter 2 reviews the heuristic solution procedure developed by Gau. Chapter 3 gives the integer programming formulation and the results obtained. Chapter 4 describes the heuristic solution procedure to maximize the tons processed per hour. Chapter 5 contains the conclusions made from this study. The Appendices contain tables of the results, program listings and references. (ERA citation 11:005609)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号