首页> 美国政府科技报告 >GPACC (General Purpose Aft Cargo Carrier) Program Cost Work Breakdown Structure-Dictionary. General Purpose Aft Cargo Carrier Study,Volume 3.
【24h】

GPACC (General Purpose Aft Cargo Carrier) Program Cost Work Breakdown Structure-Dictionary. General Purpose Aft Cargo Carrier Study,Volume 3.

机译:GpaCC(通用船尾货运承运人)计划成本工作分解结构 - 词典。通用船尾货物运输船研究,第3卷。

获取原文

摘要

The results of detailed cost estimates and economic analysis performed on the updated Model 101 configuration of the general purpose Aft Cargo Carrier (ACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the ACC on the Space Transportation System (STS). The detailed cost estimates for the ACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/ACC launch vehicle cost impacts for delivering payloads to a 160 NM low Earth orbit (LEO).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号