首页> 美国政府科技报告 >Meeting NPDES permit limits for an effluent-dependent stream
【24h】

Meeting NPDES permit limits for an effluent-dependent stream

机译:符合NpDEs允许限制依赖污水的河流

获取原文

摘要

When the Savannah River Site in Aiken, South Carolina received a National Pollutant Discharge Elimination System permit containing very low copper and toxicity limits for an effluent-dependent stream, an innovative and cost-effective method to meet them was sought. The South Carolina Department of Health and Environmental Control mandated that compliance with the new limits be achieved within three years of the effective date of the permit. SRS personnel studied various regulatory options for complying with the new limits including Water Effect Ratio, use of a Metals Translator, blending with additional effluents, and outfall relocation. Regulatory options were determined to not be feasible because the receiving stream is effluent dependent. Treatment options were studied after it was determined that none of the regulatory pathways were viable. Corrosion inhibitors were evaluated on a full-scale basis with only limited benefits. Ion exchange was promising, but not cost effective for a high flow effluent with a very low concentration of copper. A treatment wetlands, not normally given consideration for the removal of metals, proved to be the most cost effective method studied and is currently under construction.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号