首页> 美国政府科技报告 >Engineer,Design, Construct,Test,and Evaluate a Pressurized Fluidized Bed Pilot Plant Using High Sulfur Coal for Production of Electric Power. Phase II Pilot Plant Design. Pilot Plant Configuration Report.
【24h】

Engineer,Design, Construct,Test,and Evaluate a Pressurized Fluidized Bed Pilot Plant Using High Sulfur Coal for Production of Electric Power. Phase II Pilot Plant Design. Pilot Plant Configuration Report.

机译:工程师,设计,建造,测试和评估使用高硫煤生产电力的加压流化床试验工厂。第二阶段试验工厂设计。试验工厂配置报告。

获取原文

摘要

The configuration selected for the application of the pressurized fluidized bed (PFB) process for direct combustion of high sulfur coal (greater than or equal to 3%) in a combined gas turbine/steam turbine cycle includes: (a) gas turbines to provide compressed air for coal combustion (exp 1 /sub 3of the airflow) and air cooling in the PFB heat exchanger (exp 2 /sub 3of the airflow); (b) recombination of the total compressor airflow after heating for expansion in the compressor drive turbine and further expansion in a power turbine which drives an alternator; (c) gas turbine waste heat recovery in a steam boiler which powers a steam turbine/alternator. The selected configuration limits the hot gas flow which must be passed through a particulate clean-up system to approximately exp 1 /sub 3of the total gas turbine flow and reduces the concentration of corrosive combustion products in the recombined turbine gas steam to exp 1 /sub 3of the concentration which exists in the combustion gas exiting the PFB. The PFB Pilot Plant design incorporates an existing power plant with considerable utilization of currently operating equipment. The basic equipment and functions are listed:coal and sorbent unloading and storage systems,coal sizing and drying system,coal and sorbent feed system,remote start-up combustors liquid or gas fuel fired,PFB combustor with ash handling equipment,combustor bed heat exchange system,gas cleaning systems,combustion and cooling air compressor and turbine,gas turbin alternator drive,alternator and switch gear,waste heat recovery boiler,and a computerized control system. (ERA citation 03:054899)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号