首页> 美国政府科技报告 >Engineer, Design, Construct, Test and Evaluate a Pressurized Fluidized Bed Pilot Plant Using High Sulfur Coal for Production of Electric Power. Phase I. Preliminary Engineering. Phase II. Pilot Plant Final Design. Quarterly Report, March 1-May 31, 1979
【24h】

Engineer, Design, Construct, Test and Evaluate a Pressurized Fluidized Bed Pilot Plant Using High Sulfur Coal for Production of Electric Power. Phase I. Preliminary Engineering. Phase II. Pilot Plant Final Design. Quarterly Report, March 1-May 31, 1979

机译:工程,设计,建造,测试和评估使用高硫煤生产电力的加压流化床试验工厂。第一阶段初步工程。第二阶段。试验工厂最终设计。 1979年3月1日至5月31日的季度报告

获取原文

摘要

Technical progress on DOE Contract No. EX-76-C-01-1726 during the period March 1 through May 31, 1979 is described herein. Preparation of the SGT/PFB Technology Unit for evaluation of an improved hot gas cleanup system and extended materials testing is discussed. Conceptual design of all key components of the Pilot Plant has been completed. Approval for procurement of long lead material and certified drawings of subcontractor equipment was received from DOE. (ERA citation 06:023415)

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号