首页> 美国政府科技报告 >Closeout of IE Bulletin 80-14: Degradation of BWR (Boiling Water Reactor) Scram Discharge Volume Capability.
【24h】

Closeout of IE Bulletin 80-14: Degradation of BWR (Boiling Water Reactor) Scram Discharge Volume Capability.

机译:IE Bulletin 80-14的结束:BWR(沸水反应堆)scram放电容量的降级。

获取原文

摘要

Documentation is provided in the report for the closeout of IE Bulletin 80-14 regarding degradation of safety-related scram discharge volume (SDV) systems in General Electric (GE) boiling water reactors (BWRs). Closeout is based on the implementation and verification of six required licensee actions. Evaluation of utility responses and NRC/Region inspection reports indicates that the bulletin is closed for all of the 23 facilities to which it was issued for action. The bulletin was issued June 12, 1980 as a result of SDV events at two plants. Furthermore, studies of related anticipated transients without scram (ATWS) raised concern that the SDV function may be degraded by the undetected presence of fluid in the SDV. The bulletin was forwarded for information only to all GE power reactor facilities with a construction permit.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号