首页> 美国政府科技报告 >Joint Vision 2010, Priority of Effort and Airspace Management: The Long Pole in the Tent
【24h】

Joint Vision 2010, Priority of Effort and Airspace Management: The Long Pole in the Tent

机译:2010年联合展望,努力和空域管理的优先事项:帐篷中的长杆

获取原文

摘要

Integration of the new operational concepts described in JV 2010 requires an evaluation of the current joint doctrine and airspace C2 systems. Because JV 2010 operational concepts are dependent upon airborne platforms, both a fully integrated and interoperable airspace C2 system that can track all airborne systems and a coherent joint doctrine that allows the joint force staff to rapidly prioritize airspace use are required to support 2010 joint operations. Aviation is the primary operational fire support asset of the joint force, consequently the JFACC enjoys a special relationship with the JFC. Joint force fires coordination involves the integration of component or service capabilities across the full spectrum of air, land and sea forces. Apportioning fire support assets to the component commanders to service their priorities facilitates precision engagement. Assigning the J-3 or a JFE responsibility for developing the JIPTL will ensure that each component commander's priorities are more appropriately ranked. JV 2010 operations will require unrestricted access to information about enemy and friendly forces. Building service or component airspace C2 systems that provide the necessary level of detail on all airborne platforms will be very expensive, but must become an acquisition priority if JV 2010 concepts are to become reality.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号