首页> 美国政府科技报告 >AFSOC Assets Beddown at Cannon Air Force Base, New Mexico Environmental Impact Statement.
【24h】

AFSOC Assets Beddown at Cannon Air Force Base, New Mexico Environmental Impact Statement.

机译:aFsOC在新墨西哥州Cannon空军基地资产下沉环境影响声明。

获取原文

摘要

This Final EIS has been prepared in accordance with the National Environmental Policy Act. Public and agency scoping resulted in the analysis of the following environmental resources: airspace management and air traffic control, noise, safety, air quality, physical (including hazardous materials and waste) biological, cultural, land use, ranching, transportation, and recreation, socioeconomics and environmental justice. Cannon AFB economic activity would increase in Curry and Roosevelt counties. Noise, safety, and other resources around and on the base would not be impacted. An airspace transit area to permit UAS transit from Cannon AFB to Melrose AFR could inconvenience, but not significantly impact, some general aviation. Melrose AFR training would increase targets, exposed soils, munitions debris, noise, and safety requirements on the range. Munitions noise could impact some residences on the periphery of the range. Expansion of the Exclusive-Use area on the range would impact lessees who use range buffer areas for grazing and agriculture. Natural biological or cultural resources would not be significantly impacted by the change in training. Airspace Military Operations Area (MOA) and MTR training activity would increase. Noise levels on MTRs and under MOAs would noticeably increase and would be expected to result in some increased annoyance. Use of water areas for training would increase activity and noise. Water training would need to be scheduled to mitigate impacts on biological species or recreationalists. Cumulative federal and non-federal actions would not be expected to result in significant impacts.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号