Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success

机译:系统工程文件的风险量化提高了国防部项目成功的可能性

获取原文

摘要

A frame transition problem exists between project Systems Engineers (SE) and Department of Defense (DoD) Program Managers (PM). Systems engineering organizations, operating in a rational frame, must produce technical documents required for the PM operating in a political frame of constrained resources. These artifacts, required for milestone reviews, are the results of extensive technical effort that must be accounted for and adequately resourced during project planning by the PM. Programs cannot progress through the DoD acquisition framework if these statutory and regulatory documents are not completed on time and of acceptable technical quality, which is determined during a complicated multi-organization review process. By providing the PM and DoD decision makers with a quantified risk assessment methodology during project planning, these key artifacts can be included in initial program risk assessment activities. This thesis provides the methodology for developing a comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration (CMMI) Project Planning and Risk Management process areas. The intent is to use risk as the common ground between the DoD PM and SE so that each can operate within their respective environments with a common and consistent understanding of risk.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号