首页> 美国政府科技报告 >Afloat Spectrum Management News. Volume 6: Frequency Plans in Five Easy Steps
【24h】

Afloat Spectrum Management News. Volume 6: Frequency Plans in Five Easy Steps

机译:海上频谱管理新闻。第6卷:五个简单步骤中的频率规划

获取原文

摘要

Software should make your job easier, and AESOP was designed with that in mind. Using AESOP, you can create and analyze frequency plans in five easy steps. Step 1. Establish AESOP Workspace: During this step, the AESOP software is updated, and information found on the Collaboration at Sea (CAS) website and in the Letter of Instruction (LOI) and/or deployment briefings is used to set up the AESOP workspace. Steps 2 to 4. Spectrum Planning Process: Request Information; Receiver Information; and Create Frequency Plan. Once the workspace has been established, planners are prepared to implement the spectrum planning process outlined in Tactical Memorandum (TACMEMO) 3-13.2-04, Afloat Electromagnetic Spectrum Planning and Management, which is automated in AESOP via the following three steps: Request information; receiver information; and create the frequency plan.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号