首页> 美国政府科技报告 >A Computer Analysis Of a Tri-Moored Buoy Structure with an Internally Redundant Horizontal Structural Element.
【24h】

A Computer Analysis Of a Tri-Moored Buoy Structure with an Internally Redundant Horizontal Structural Element.

机译:具有内部冗余水平结构单元的三体浮标结构的计算机分析。

获取原文

摘要

This report is concerned with the analysis and computer simulation of a tri-moored oceanic buoy structure having a near-horizontal cable connected between two of the three main legs. The Method of Imaginary Reactions is used in conjunction with the Method of Successive Approximations to determine the equilibrium configuration of the cable array. A special technique is developed to extend the above methods to include cable arrays with one internally redundant loop. Computer search routines are developed to ensure convergence to the solution for equilibrium positions of the cable array. The analysis permits the inclusions of discrete elements and floating devices distributed along all cables. Expressions are derived in detail for the hydrodynamic forces. Both tangential and normal drags are included in the calculation of these forces; however, the forces induced by wave action are not considered. A computer program for implementing the analysis is included.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号