首页> 美国政府科技报告 >Grouting of Scoured Foundation, Old River Low Sill Structure, Louisiana.
【24h】

Grouting of Scoured Foundation, Old River Low Sill Structure, Louisiana.

机译:道路基础的灌浆,老河低槛结构,路易斯安那州。

获取原文

摘要

In the emergency grouting operations at the Old River Low Sill Structure, Louisiana, in late 1973 and early 1974, the Concrete Laboratory of the U.S. Army Engineer Waterways Experiment Station was responsible for (a) development of a series of grout mixtures for placement in scoured areas, (b) supervision of mixing and placement of the grout mixtures, (c) development of instrumentation for monitoring uplift pressure and grout levels and locations beneath the structure, (d) the actual monitoring of uplift pressure and grout levels during grouting operations, and (e) determining the physical properties of field-placed grout. It is believed, after many check borings, that the physical properties of the field-placed grout closely match the design criteria, and the scoured areas have been successfully replaced. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号