首页> 美国政府科技报告 >Archaeological Reconnaissance Survey of the Proposed Channel Realignment Area at Big Stone-Whetstone Flood Control Project, Big Stone and Lac Qui Parle Counties, Minnesota
【24h】

Archaeological Reconnaissance Survey of the Proposed Channel Realignment Area at Big Stone-Whetstone Flood Control Project, Big Stone and Lac Qui Parle Counties, Minnesota

机译:明尼苏达州Big stone和Lac Qui parle县大石油防洪工程建议航道调整区的考古勘察调查

获取原文

摘要

The project area is located along the upper Minnesota River. It is located southeast of Big Stone Lake and Ortonville, Minnesota in sections 16, 21, 22, and 27; Township 121N, Range 46W. The proposed channel realignment and associated spoilbanks are approximately 2 miles long with a right-of-way corridor of 500 feet. Survey methodologies included surface reconnaissance, shovel testing, rake testing, and cut bank planing. The combination of field methods utilized in various areas of the project were dependent upon varying field conditions. Surface reconnaissance was done at a 10 meter interval and shovel testing was done at a 15 meter interval. No artifactual material or cultural features were located within the project area as a result of the field investigation. Based upon the results of this survey, it appears that no archaeological sites will be altered, damaged, or destroyed as a result of construction activities.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号