首页> 美国政府科技报告 >A Method for Calculating Industrial Mobilization Requirements Which Incorporates Production Process Times. Volume II. Appendices.
【24h】

A Method for Calculating Industrial Mobilization Requirements Which Incorporates Production Process Times. Volume II. Appendices.

机译:一种计算生产过程时间的工业动员需求的方法。第二卷。附录。

获取原文

摘要

This paper presents a new economic model for assessing the industrial requirements generated by increased production for defense during a mobilization or due to a surge in requirements during peacetime. The model's procedure combines an input-output analysis of the direct and indirect requirements associated with defense production with information on processing times in each industry. In this way, one can determine not only the magnitude of production surges but also the time of peak activity in each industrial sector. The model is used to simulate increases of 50 to 200 percent in the level of overall defense spending. Two sorts of bottlenecks are identified--the first involving industries where peak requirements exceed capacity and the second, where cumulated processing times exceed the preparation period envisioned in the scenario.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号