首页> 美国政府科技报告 >Pilot Plant Testing of Caustic Spray/Hot Gas Building Decontamination Process
【24h】

Pilot Plant Testing of Caustic Spray/Hot Gas Building Decontamination Process

机译:碱性喷涂/热气建筑净化过程的中试装置测试

获取原文

摘要

The U.S. Army operates and/or owns ammunition plants and depots involved in the manufacture, processing, loading and storage of pyrotechnic, explosives and propellant (PEP) materials. These operations involve permanent facilities and a variety of process and handling equipment. Many of these facilities are in an inactive or stand-by status and are candidates for excessing operations. In some cases, explosive contaminated structures have significant reuse potential for conversion to other industrial processes. In order to recover these valuable resources, non-destructive decontamination techniques are necessary to eliminate the explosive and toxic hazard of any munition processing wastes. The use of hot gas treatment (with or without caustic spray) appears to be a promising means of decontaminating explosive contaminated buildings. More importantly, this hot gas decontamination process appears to be non-destructive in nature and, therefore, has the potential for rendering treated buildings available for reuse or excessing operations.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号