Technical Report - Study/Services Installation/Implementa- tion Schedule Analusis. Cargo Movement Operation Systems (CMOS) - 16 November 1989.

机译:技术报告 - 研究/服务安装/实施计划analusis。货物运输操作系统(CmOs) - 1989年11月16日。

获取原文

摘要

This report was initiated to develop an up-to-date base line installation/implementation schedule upon which CMOS-related activities can be planned. It includes all known additions, deletions, and changes and discusses two separate schedules. The first is developed to depict the logistical constraints imposed by the Government, and the second set applies travel and work restrictions to determine optimal supportability. The installation and implementation schedule for CMOS should continue to be revised as conditions warrant. Factors, such as base closures, limits on fiscal year spending, equipment lead times, overseas host country requirements, and Air Force installation priorities, may force a reevaluation and adjustment of the installation schedule. Additionally, when installation begins at the ADAM-3 sites, a reevaluation and readjustment of the schedule may again be necessary.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号