首页> 美国政府科技报告 >Proposed Actions at U.S. Army Kwajalein Atoll. Final Environmental Impact Statement (FEIS).
【24h】

Proposed Actions at U.S. Army Kwajalein Atoll. Final Environmental Impact Statement (FEIS).

机译:美国陆军夸贾林环礁的拟议行动。最终环境影响声明(FEIs)。

获取原文

摘要

The purpose of the Proposed Action is to conduct tests and collect data in support of continuing research, development, and operational missions; operational space track missions; and Strategic Defense Initiative research, development, test, and evaluation activities. Three alternatives are considered in the Environmental Impact Statement (EIS). The No-Action Alternative includes the ongoing activities at USAKA. The Proposed Action includes installation and testing of SDI sensing/tracking equipment and interceptor missile systems. Four construction projects in support of base operators are also included. Finally, the EIS examines a Change of Duration Alternative that implement as the Proposed Action over a longer period of time. The EIS examines the environmental impacts of each alternative. Where impacts were found to be potentially significant, mitigation measures are identified. Key topics addressed by the EIS include land and reef areas, water resources, air quality, noise, biological resources including endangered species, cultural resources, socioeconomics, transportation, utilities, electromagnetic radiation from radars, and range safety. Marshall Islands; Foreign government. (EDC)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号