The objective of the interim response action at the lime settling basins is tomitigate the threat of releases from the basins. The proposed IRA consists of: (1) relocation of sludge material to the settling basin; (2) construction of a 360 degree subsurface barrier around the basins; (3) construction of a soil and vegetative cover over the material; and (4) installation of a ground water extraction system. This decision document provides summaries of: (1) alternative technologies considered, (2) significant events leading to the initiation of the IRA, (3) the IRA Project, and (4) applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR's) associated with the program.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号