首页> 美国政府科技报告 >Economics of Shipyard Painting Phase III Earlier Recognition of Cost Variances.
【24h】

Economics of Shipyard Painting Phase III Earlier Recognition of Cost Variances.

机译:船厂绘画经济学第三阶段早期成本差异识别。

获取原文

摘要

Typically, Paint Shop supervision does not have tools available to compare shop performance to the budget nearly the end of a contract. The lack of information required for recognizing causes of low productivity results in cost overruns that cannot be explained. The purpose of this study was to develop a system for a Paint Department which could provide shop supervision with timely information concerning cost performance. Three areas were investigated in Phase III: Lost Time, Abnormal Conditions, and Hotwork Identification. Lost Time occurs when a worker is physically ready to perform the work defined by the work order, but must wait for some event to occur before work can be started. Abnormal conditions are those factors which hamper productivity and drive costs. Hotwork Identification was found to be important in quantifying the amount of rework resulting from hotwork not completed before blast and paint.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号