首页> 美国政府科技报告 >PRIME - Power Requirements for Installations and Military Encampments. Version2.1. Maintenance Manual
【24h】

PRIME - Power Requirements for Installations and Military Encampments. Version2.1. Maintenance Manual

机译:pRImE - 装置和军事营地的电力需求。 Version2.1。保养手册

获取原文

摘要

The Army uses prime power - large, mobile generators - in its rear areas tobridge the gap between commercial power and tactical generators. When supplying concentrations of Army units, prime power is less vulnerable than commercial power and demands less fuel and maintenance than tactical generators. The Engineering and Housing Support Center of the U.S. Army Corps of Engineers procures, operates, and maintains the Army's prime power equipment. Power Requirements for Installations and Military Encampments (PRIME) is the model that the Center uses to calculate prime-power requirements for selected Army units and facilities in specific-wartime scenarios. Users can operate, understand, and maintain PRIME at a number of levels. An end user can operate PRIME simply by following the instruction on the screen. A more sophisticated user may wish to examine the underlying algorithms. Similarly, we have made it possible for the maintenance programmer to update PRIME periodically by revising only the static data files, without having to revise and recompile any of the executable machine programs. At the next level, a maintenance programmer who wishes to change PRIME can examine the program's source code and revise the program's capabilities by editing and recompiling the source code. Keywords: Electricity; Prime Power; Generators; Mobilization; Tactical generators. (JHD)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号