Red River Waterway, Lock and Dam No. 3. Report 4. Stilling Basin and Riprap Requirements. Spillway Hydraulic Model Study.

机译:红河水道,锁和大坝3号。报告4.消力池和抛石处理要求。溢洪道水力模型研究。

获取原文

摘要

Tests were conducted on a 1:50-scale model of Lock and Dam No. 3, Red River Waterway, to develop a satisfactory energy dissipator and a stable riprap plan. The spillway consists of 315-ft-long overflow weirs and six 42-ft-high by 60-ft-wide tainter gates. The 84-ft-wide by 785-ft-long lock will be located on the left river bank looking downstream and will have a maximum lift of 31 ft. The recommended stilling basin provides adequate energy dissipation for normal water flow and for a single gate fully opened with minimum tailwater. Stable riprap plans were developed for the upstream and downstream areas adjacent to the structure for both normal flows and flow rate and for a single gate conditions. Pressures measured on the spillway crest were sufficiently high to prevent cavitation problems on the downstream ace of the crest. Water-surface profiles were measured for a wide range of conditions and are compared to computed spillway rating curves.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号