...
首页> 外文期刊>Physics world >Cautious ITER chiefs opt for 2026 target
【24h】

Cautious ITER chiefs opt for 2026 target

机译:谨慎的ITER负责人选择2026年目标

获取原文
获取原文并翻译 | 示例
           

摘要

The redesign and recosting of the ITERfusion project took a step closer tocompletion last month when the project'scouncil approved a step-by-step approach to construction designed to reduce the risk of something going wrong. Under the new plan, only a stripped-down reactor will be ready In 2018 to produce a plasma of normal hydrogen. Researchers will not attempt to achieve a burning plasma, which requires a fuel of deuterium and tritium, until late 2026 - up to two years later than planned - after further components have been added.
机译:上个月,ITERfusion项目的重新设计和重计费用接近完成阶段,当时该项目的理事会批准了逐步施工的方法,旨在降低发生问题的风险。根据新计划,到2018年,只有精简的反应堆将准备就绪,可产生正常氢等离子体。在添加更多的成分之后,直到2026年下半年(比计划晚了两年),研究人员才会尝试实现燃烧的等离子体,这种等离子体需要氘和tri的燃料。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号