Fast turnaround for a SRU tail gas scrubber

机译:SRU尾气洗涤塔的快速周转时间

获取原文
获取原文并翻译 | 示例
       

摘要

When a lubricants producer experienced a catastrophic failure of an existing SRU tail gas scrubber, it was faced with a very costly and possibly extended shutdown of its facility. Under pressure to meet permitted emissions regulations within six months of the incident, the company was offered a 72-week (18-month) replacement schedule from the original scrubber vendor. Working with MECS DynaWave, the producer was able to complete the project from start to finish in 18 weeks and at substantial cost savings. This article reviews the incident and lessons learned, presents the project timeline and actions that took place to be able to achieve the short turnaround as well as the cost savings realised, and reviews DynaWave technology and its application in SRU tail gas treatment.
机译:当润滑剂生产商遇到了现有SRU尾气洗涤塔的灾难性故障时,它面临着非常昂贵的关闭设备的可能,并且可能会延长其停机时间。在事件发生后六个月内要满足允许排放法规的压力下,原始洗涤塔供应商为公司提供了72周(18个月)的更换时间表。与MECS DynaWave合作,制作人能够在18周内从头到尾完成该项目,并节省了可观的成本。本文回顾了该事件和所汲取的教训,介绍了能够实现短期周转以及所实现的成本节省的项目时间表和所采取的措施,并回顾了DynaWave技术及其在SRU尾气处理中的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号