Red Cliff Arch Rehabilitation Project

机译:红崖拱门修复项目

获取原文
获取原文并翻译 | 示例

摘要

Located near Red Cliff, CO, southwest of Vail on U.S. Highway 24, the Red Cliff Arch Bridge was originally completed in 1941. Sixty-three years later, the bridge was in dire need of help. Due to age, as well as loads and traffic that were not envisioned in the 1940s, the bridge needed an extensive rehabilitation. The newly rehabilitated Red Cliff Arch Bridge was dedicated in November 2004. Preserving the structure's historical integrity, while updating it to current safety standards and strength requirements, was the driving force behind the project. Safety was also a critical concern during construction. With the bridge 200' above a valley floor, traditional scaffolding was not feasible. The bridge crosses over an existing county road, a river, and a railroad. Any falling material would have been hazardous not only to the public, but also to the environment. A hard platform scaffolding system was required and provided several safety and schedule benefits.
机译:Red Cliff拱桥位于美国24号高速公路上Vail西南的科罗拉多州红崖附近,最初于1941年完工。六十三年后,这座桥迫切需要帮助。由于年代久远,以及1940年代未曾预料到的负载和交通,桥梁需要进行大规模的修复。新近修复的红崖拱桥于2004年11月投入使用。在保持结构历史完整性的同时,将其更新到当前的安全标准和强度要求是该项目的原动力。安全也是施工过程中的关键问题。由于桥梁200'位于谷底之上,因此传统的脚手架是不可行的。这座桥跨越了一条现有的县道,一条河和一条铁路。任何掉落的材料不仅会对公众和环境造成危害。需要一个硬平台脚手架系统,该系统提供了一些安全性和时间表优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号