首页> 外文期刊>Southwest Contractor >New Mexico Best of 2007/US 550/Arroyo Penasco Retaining Wall
【24h】

New Mexico Best of 2007/US 550/Arroyo Penasco Retaining Wall

机译:新墨西哥州最佳2007 /美国550 /阿罗约·佩纳斯科护墙

获取原文
获取原文并翻译 | 示例

摘要

The construction team on this project found a unique solution to erosion control: roll out used tires to stop an arroyo from eroding a right of way. The 490,000 dollars project began June 2006 and was completed September 2006. Along US 550 northwest of San Ysidro, the meandering Arroyo Penasco, with vertical banks, was cutting into the highway right-of-way, so much so that in just one year it had devoured 15 ft laterally, leaving the right-of-way fence suspended 30 ft in the air.
机译:该项目的施工团队找到了一种独特的侵蚀控制解决方案:推出旧轮胎以阻止Arroyo侵蚀路权。这项耗资490,000美元的项目于2006年6月开始,并于2006年9月完成。沿着圣伊西德罗(San Ysidro)西北550号,蜿蜒曲折的Arroyo Penasco拥有垂直堤岸,正切入高速公路的道路,以至于在短短的一年内吞噬了15英尺的横向空间,使路权围栏悬挂在30英尺的空中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号