首页> 外文期刊>Southwest Contractor >P3s Help Governments Tread Water
【24h】

P3s Help Governments Tread Water

机译:P3帮助政府踩水

获取原文
获取原文并翻译 | 示例
       

摘要

Contractors and government agencies in Arizona and Nevada are testing the public-private partnerships with mixed results in delivering buildings and roadways. Arizona has led the way in vertical P3 development. Alternative project delivery legislation that allows certain P3 projects goes back to 2000. The 455-million dollars Arizona Cardinals stadium in Glendale was design-built by Phoenix-based Hunt Construction Group. It is owned by the Arizona Sports and Tourism Authority and was paid for in part by the Cardinals as tenant.
机译:亚利桑那州和内华达州的承包商和政府机构正在测试公私合作伙伴关系,在交付建筑物和道路时效果不一。亚利桑那州在垂直P3开发方面处于领先地位。允许某些P3项目使用的替代项目交付立法可以追溯到2000年。位于格伦代尔的亚利桑那红雀体育场耗资4.55亿美元,由总部位于凤凰城的Hunt Construction Group设计建造。它由亚利桑那州体育和旅游局拥有,并由红衣主教部分作为租户支付。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号