首页> 外文期刊>SBB Steel Markets Daily >Pilbara ports evacuateahead of cyclone
【24h】

Pilbara ports evacuateahead of cyclone

机译:皮尔巴拉港口在飓风前撤离

获取原文
获取原文并翻译 | 示例
           

摘要

Pilbara Ports Authorityis in the midst of evacuation proceduresat both Port Hedland andDampier in Western Australia, as atropical cyclone has been developingtoward the Pilbara region“The port of Port Hedland has commencedport and anchorage evacuationsand current planning is to have the lastdeparture clear the channel by 7 pmWestern Australia Time (1100 GMT), whenthe port will officially close,” the lateststatement released Monday afternoon bythe port authority said. The port of Dampieris aiming for the evacuation process to becompleted at an earlier time of 3 pm.
机译:皮尔巴拉港务局正处于西澳大利亚州黑德兰港和丹皮尔的疏散程序之中,因为热带气旋正在向皮尔巴拉地区发展。“黑德兰港已开始港口运输和锚定撤离,目前的计划是在下午7点之前最后一班通航。澳大利亚时间(格林尼治标准时间1100),该港口将正式关闭,”港口当局周一下午发布的最新声明说。 Dampieris港口的撤离程序旨在在下午3点之前完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号