首页> 外文期刊>Oil Information Technology Journal >Another dry hole? Another MDM project!
【24h】

Another dry hole? Another MDM project!

机译:另一个干洞?另一个MDM项目!

获取原文
获取原文并翻译 | 示例
           

摘要

Let's pretend that I am the exploration manager for a medium sized oil and gas outfit company and we have just drilled an expensive dry hole. I am feeling the heat already. During the drilling, as is customary-well it used to be I don't suppose it is now-the company's top brass, WAGS~* in tow (sorry for the sexism but World Cup oblige) all traipsed out to the drill site located in a woodland area to witness the well test and (hopefully) celebrate. During the visit, the CEO and her husband (back in your good books?) wandered off (what could they have been up to?) into the woods and discovered an old abandoned well head only a couple of hundred yards from ours!
机译:假设我是一家中型油气装备公司的勘探经理,而我们刚刚钻了一个昂贵的干井。我已经感觉到热了。在钻井过程中,按照惯例,以前不是我现在想的那样-公司的顶级黄铜WAGS〜*拖着走(对性别歧视表示抱歉,但世界杯很遗憾)全部流失到位于在林地里见证试井并(希望)庆祝。在访问期间,CEO和她的丈夫(回到您的好书吗?)徘徊(他们想做什么?)走进树林,发现离我们只有几百码的废弃旧井口!

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号