首页> 外文期刊>Rail Engineering International >Accessibility issues and the light rail project of Bergen, Norway: Bybanen
【24h】

Accessibility issues and the light rail project of Bergen, Norway: Bybanen

机译:挪威卑尔根的可达性问题和轻轨项目:Bybanen

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Currently, the first phase of the Bergen Light Rail system, officially called and registered as Bybanen: Bergen Light Rail, is under construction. Once completed, the 9.8 km line between Bergen city centre and the centre of the suburb Nesttun is expected to serve 26,000 passengers each weekday. Public hearings have already started for an initial 3 km extension to the system and plans are being advanced for other extensions and lines. A city-wide network of about 50 km is envisaged, pending approvals. In this article, the challenges faced by the designers of the Bergen Light Rail system with regard to accessibility, specifically the challenges arising from the overall goal of universal design, are addressed.
机译:目前,卑尔根轻轨系统的第一阶段(正式名称为Bybanen:卑尔根轻轨)正在建设中。一旦完成,卑尔根市中心和Nesttun郊区中心之间的9.8公里线预计每天将为26,000名乘客提供服务。对于系统的最初3 km扩建,已经开始进行公开听证,并且针对其他扩建和线路的计划也正在推进中。预计将有约50公里的全市范围的网络,尚待批准。在本文中,解决了卑尔根轻轨系统设计人员在可访问性方面面临的挑战,特别是通用设计总体目标所带来的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号