首页> 外文期刊>Natural Gas Week. >Chesapeake Moves Fast in Shale Play; Six Haynesville Wells Done
【24h】

Chesapeake Moves Fast in Shale Play; Six Haynesville Wells Done

机译:切萨皮克在页岩气开发中进展迅速;海恩斯维尔六口井(Haynesville Wells Done)

获取原文
获取原文并翻译 | 示例
           

摘要

Chesapeake Energy said last week it plans to accelerate the pace of its drilling in the Haynesville Shale play of North Louisiana and East Texas after dramatically expanding the acreage it has under lease. Chief Executive Aubrey McClendon reiterated the company's conviction that the Haynesville Shale "could potentially have a larger impact on the company than any other play in which we have participated to date." Chesapeake first revealed its lease acquisition and drilling campaign in the Haynesville Shale in late March, saying at the time it held 200,000 net acres of land that could hold as much as 7.5 trillion cubic feet of gas.
机译:切萨皮克能源公司(Chesapeake Energy)上周表示,在大幅扩大其租赁土地的面积后,它计划加快在北路易斯安那州和东德克萨斯州的海恩斯维尔页岩气田的钻探进度。首席执行官奥布里·麦克伦登(Aubrey McClendon)重申了公司的信念,即海恩斯维尔页岩“对我们的影响可能比迄今为止我们参与的任何其他活动都要大”。切萨皮克(Chesapeake)于3月下旬在海恩斯维尔页岩(Haynesville Shale)首次披露了其租赁收购和钻探活动,称当时拥有200,000英亩净土地,可容纳7.5万亿立方英尺的天然气。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号