首页> 外文期刊>Modern Power Systems: Communicating Power Technology Worldwide >California ramping: Siemens' first Flex-Plant 30 is due to go commercial in September
【24h】

California ramping: Siemens' first Flex-Plant 30 is due to go commercial in September

机译:加利福尼亚的产能猛增:西门子的首台Flex-Plant 30将于9月投入商业运营

获取原文
获取原文并翻译 | 示例
       

摘要

With increasing amounts of weather dependent renewables on his system, and about 900 MW of wind generation able to come on to the grid and disappear from it within a 30 minute time frame, "flexibility is the holy grail" believes Stephen Berberich, CEO of the California ISO. But in the Lodi Energy Center, which, according to Siemens will be the first "first fast start combined cycle power plant in the USA in commercial operation", he seems to have found it.
机译:随着他的系统上依赖天气的可再生能源数量的增加,以及大约900 MW的风力能够在30分钟内进入电网并从电网中消失,“灵活性是圣杯”,该公司首席执行官Stephen Berberich认为。加州ISO。但是在Lodi能源中心(据西门子称,该中心将成为“美国首个商业运营的快速启动联合循环发电厂”)中,他似乎已经找到了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号