首页> 美国政府科技报告 >Studsvik Super-Ramp Extension Project: Progress Report, March 1, 1985-September 30, 1985.
【24h】

Studsvik Super-Ramp Extension Project: Progress Report, March 1, 1985-September 30, 1985.

机译:studsvik super-Ramp Extension project:progress Report,1985年3月1日 - 1985年9月30日。

获取原文

摘要

This is the third progress report distributed from the Studsvik Super-Ramp Extension Project. It covers the period March through September 1985. The scope of the Technical Program for the Project is an extension of the work already performed in the Super-Ramp Project and is an experimental investigation of the pellet-clad interaction (PCI) performance under power ramp conditions for commercial type LWR test fuel rods irradiated to high burnup. The program incorporates the following two subprograms: a PWR subprogram with complementary post irradiation examinations of Super-Ramp PWR test fuel rods, and with power rampings of KWU test fuel rods (PK1X). A BWR subprogram with complementary post irradiation examinations of Super-Ramp BWR test fuel rods, and with slow power rampings of AA test fuel rods. 18 refs., 2 tabs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号