Siemens Flex-Plant with Clean-Ramp

机译:带有清洁坡道的西门子Flex-Plant

获取原文

摘要

Conventional combined cycle power plant started slowly to enable the HRSG and steam turbine to warm up. With more renewable energy such as wind and solar coming on line, there is a greater need for combined cycle gas turbine (CCGT) facilities to start up more quickly and ramp at high rates to follow grid demand. To meet the need to make up for the potential generation short fall from renewable sources (i.e., wind and solar), new designs have been implemented which enable CCGT facilities to start up (or shut down) at a moment's notice, and ramp at a much higher rate (up or down) to follow grid demand. Old plants are trying to adapt, and new designs have become available with flexible features designed to meet these need needs. Siemens Flex-Plant™ combined cycles are now in operation, and have demonstrated the ability to startup much quicker and achievement of emissions compliance much faster than conventional CCGTs have been able to achieve in the past. The latest version of the Flex-Plant offers Siemens Clean-Ramp™ technology which enables these plants to stay in emissions compliance even when ramping frequently. The Clean-Ramp strategy includes forward feed control logic to improve response time, and a gas turbine (GT) tuning approach that aids in maintaining stack emissions compliance during ramping. This paper presents results showing the reductions in actual operating facility Flex-Plant startup emissions and times to emissions compliance. In addition, this paper presents the results of Clean-Ramp implemented at a Siemens Flex-Plant in California. During demonstration of Clean-Ramp at this facility, the GT was ramped continuously at ≥ 30 MW/min between approximately 115 MW to base load throughout the hour. The results show that stack NO_X, CO and NH_3 slip were all maintained at less than 2 ppmvd @ 15% O_2 during the entire hour.
机译:传统的联合循环发电厂起步缓慢,以使HRSG和蒸汽轮机预热。随着越来越多的可再生能源(例如风能和太阳能)的出现,对联合循环燃气轮机(CCGT)设施的需求越来越大,它们需要更快地启动并以高速率加速运行以适应电网需求。为了满足弥补可再生能源(即风能和太阳能)潜在发电不足的需求,已经实施了新的设计,使CCGT设施可以在启动时立即启动(或关闭),并在启动时停机。更高的速率(向上或向下)以跟随电网需求。老工厂正在努力适应,而新设计已经具有可满足这些需求的灵活功能。西门子Flex-Plant™联合循环现已投入运行,并且已证明其具有比过去传统CCGT更快的启动速度和实现排放合规性的能力。最新版本的Flex-Plant提供了Siemens Clean-Ramp™技术,使这些工厂即使在频繁加坡时也能保持排放合规性。 Clean-Ramp策略包括前馈控制逻辑以改善响应时间,以及燃气轮机(GT)调整方法,可帮助在倾斜过程中保持烟囱排放标准。本文提供的结果显示了实际运营设施Flex-Plant启动排放量的减少以及排放合规时间的减少。此外,本文还介绍了在加利福尼亚州的Siemens Flex-Plant实施的Clean-Ramp的结果。在该设施的清洁斜坡演示期间,整个小时内,GT均以≥30 MW / min的速度在大约115 MW的范围内连续倾斜至基本负载。结果表明,在整个小时内,烟囱中的NO_X,CO和NH_3泄漏均保持在小于2 ppmvd @ 15%O_2的水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号