首页> 外文期刊>Mineral Planning >More time allowed for clay extraction at proposed fishery site
【24h】

More time allowed for clay extraction at proposed fishery site

机译:拟议的渔业地点有更多时间进行粘土开采

获取原文
获取原文并翻译 | 示例
           

摘要

Warwickshire County Council has approved an application to extend time limits for clay extraction with restoration to fishing ponds at a farm near Tamworth. Permission was granted in 2013 for the development, which required clay extraction to cease by the end of July 2013 and the site to be restored by January 2015.The current application sought to extend the time allowed for clay extraction until July 2015 with restoration by the end of January 2016.The applicant said the extra time was needed because of the delay in securing an environmental permit for the importation of waste materials.
机译:沃里克郡县议会已经批准了一项延长泥土开采期限的申请,并延长了塔姆沃思附近农场的鱼塘的修复范围。该开发项目于2013年获得许可,该项目要求在2013年7月底之前停止对粘土的开采,并在2015年1月之前对该场地进行修复。目前的申请试图将允许的粘土开采时间延长至2015年7月,并于2015年7月恢复。申请人表示,由于延迟获得进口废料的环境许可证,因此需要额外的时间,即2016年1月。

著录项

  • 来源
    《Mineral Planning》 |2015年第157期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号