首页> 外文期刊>Mineral Planning >More time allowed for building stone extraction at coastal quarry
【24h】

More time allowed for building stone extraction at coastal quarry

机译:沿海采石场有更多时间进行石料开采

获取原文
获取原文并翻译 | 示例
           

摘要

Cumbria County Council has extended the operational timescale for the extraction of St Bees red sandstone from Birkhams quarry near Whitehaven by a further 15 years until 31 July 2030. The quarry produced building stone and dimension stone and was located on the west Cumbrian coast, accessed via a one-kilometre private road. Wainwright's coast-to-coast path adjoined the site, which was also partly within a site of special scientific interest and heritage coast designation. The older part of the quarry was a local geo conservation site for its exposures of the fluvial sandstones of the St Bees sandstones.
机译:坎伯里亚郡议会已将在Whitehaven附近的伯克姆斯采石场开采圣蜜蜂红砂岩的作业时间再延长了15年,直到2030年7月31日。该采石场生产建筑石材和尺寸石材,位于西坎伯里亚海岸,可通过一公里的私家路。温赖特(Wainwright)的从海岸到海岸的路径与该地点相连,该地点也部分位于具有特殊科学兴趣和指定遗产海岸的地点内。采石场的较旧部分是当地的地质保护站点,因为它暴露了圣蜜蜂砂岩的河流砂岩。

著录项

  • 来源
    《Mineral Planning》 |2015年第159期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号