首页> 外文期刊>Metal Architecture >Metal Fills Requirements Relating To University's New Athletic Arena
【24h】

Metal Fills Requirements Relating To University's New Athletic Arena

机译:与大学新竞技场有关的金属填充要求

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

With need often comes opportunity. At Lipscomb University, officials turned the need for a new athletic arena into an opportunity to enhance the overall campus environment and further define its physical spaces. For reasons relating to both form and function, metal construction products were extensively used on the building's exterior. The new 18 million dollars Allen Arena - located in Nashville, TN - replaces an outdated gymnasium built in 1950. Seating over 5,000 people, it provides the university and surrounding community with a medium-sized venue for hosting a wide variety of events. In its dual role, the 110,000 sq. ft. building also serves as a fellowship hall for the University Chapel, enabling the University to conduct chapel services for the entire student body in one sitting. The site of the new arena was chosen in accordance with the University's master plan. The building was oriented so that its main entrance terminates the campus' main north/south axis. Through its placement, the structure also adds definition to the boundary of a new pedestrian mall that runs in an east/west direction.
机译:需求经常会带来机会。在Lipscomb大学,官员们将对新运动场的需求变成了改善整体校园环境并进一步定义其物理空间的机会。由于形状和功能方面的原因,金属建筑产品广泛用于建筑物的外部。新的造价1800万美元的艾伦体育馆(Allen Arena)位于田纳西州纳什维尔(Nashville),取代了建于1950年的过时体育馆。该体育馆可容纳5,000多人,为大学及周边社区提供了举办各种活动的中型场地。在这双重作用下,这座110,000平方英尺的建筑物还充当了大学礼拜堂的奖学金堂,使大学能够一次就座地为整个学生团体提供礼拜堂服务。新场地的选址是根据大学的总体规划选择的。建筑物的方向应使其主要入口终止校园的主要南北轴线。通过放置,该结构还为沿东/西方向延伸的新步行街的边界增加了清晰度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号