首页> 外文期刊>Environment & Energy Report >U.S. Power Grid Planning Draft Rules Factor In Bad Weather (1)
【24h】

U.S. Power Grid Planning Draft Rules Factor In Bad Weather (1)

机译:美国电网规划规则草案将恶劣天气因素考虑在内 (1)

获取原文
获取原文并翻译 | 示例

摘要

The top U.S. energy regulator released the first set of draft rules for upgrading and expanding the country’s aging electric grid to create a cleaner, more resilient network.The Federal Energy Regulatory Commission proposed rules that would require regional transmission planning to consider at least 20-year impacts, including the changing power-anddemandmix and extreme weather events, according to a staff presentation released Thursday. Utilities and planners will also be required to seek agreement from states in each regionfor cost allocation. The comment period is 75 days.
机译:美国最高能源监管机构发布了第一套规则草案,用于升级和扩大该国老化的电网,以创建一个更清洁、更有弹性的网络。根据周四发布的一份工作人员报告,联邦能源监管委员会提出了要求区域输电规划考虑至少20年影响的规则,包括不断变化的电力和需求组合以及极端天气事件。公用事业公司和规划者还需要寻求每个地区各州的同意才能进行成本分配。意见征询期为 75 天。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号