Surface settlement during shield tunnelling at CH218 in Taipei

机译:台北CH218盾构隧道施工中的地表沉降

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents the surface settlement performance induced by the foamed type of earth pressure balance shield in contract CH218 of the Hsintien Line of the Taipei Rapid Transit System. The surface settlement characteristics caused by the single tunnel and by twin tunnels with reference to two sections spaced at 87 m are studied. Field observations indicate that the surface settlement trough due to the single tunnel can be represented by the normal distribution. The distance of the inflection point to the tunnel center and maximum surface settlement value are consistent with those found in the literature. The characteristics of the surface settlement trough are related to the type of the soil, particularly where the crown of the tunnel is located in a layered soil deposit. The ground surface settlement induced by twin tunnels was found to be larger than estimated using the principle of superposition. [References: 11]
机译:本文介绍了台北捷运系统新天线CH218合同中泡沫型土压平衡护罩引起的表面沉降性能。研究了单隧道和双隧道引起的地表沉降特征,参考了两个相距87 m的断面。现场观察表明,由于单条隧道引起的地表沉降槽可以用正态分布表示。拐点到隧道中心的距离和最大表面沉降值与文献中的一致。表面沉降槽的特性与土壤的类型有关,特别是在隧道顶部位于分层土壤沉积物中的情况下。发现双隧道引起的地表沉降大于使用叠加原理的估计值。 [参考:11]

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号