首页> 外文期刊>Managing Information >The six steps to get started with the EU Code of Conduct for data centres
【24h】

The six steps to get started with the EU Code of Conduct for data centres

机译:欧盟数据中心行为准则的六个步骤

获取原文
获取原文并翻译 | 示例
           

摘要

With Western European data centre electricity consumption of 56 TWh per year in 2007 projected to increase to 104 TWh per year by 2020, energy efficiency has increasingly become a topic of discussion and concern among data centre operators. The cost of this energy, the risk of energy shortfalls, the pressure of ever-increasing legislation on C02 emissions and the reputational risk of being seen as energy-inefficient have all driven data centre managers to ask how exactly they can cut energy use in the enterprise.
机译:随着2007年西欧数据中心的年耗电量为56 TWh,到2020年预计将增至每年104 TWh,能源效率已日益成为数据中心运营商讨论和关注的话题。这种能源的成本,能源短缺的风险,不断增加的二氧化碳排放法规的压力以及被视为能源效率低下的声誉风险,都促使数据中心管理人员提出了以下疑问:他们如何才能在能源消耗中降低能耗?企业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号