...
首页> 外文期刊>Erdol Erdgas Kohle >Investment Risk Assessment of Potential Hydrocarbon Discoveries in a Mature Basin Case Study from the Bjelovar Sub-Basin, Croatia
【24h】

Investment Risk Assessment of Potential Hydrocarbon Discoveries in a Mature Basin Case Study from the Bjelovar Sub-Basin, Croatia

机译:克罗地亚Bjelovar次盆地的成熟盆地潜在油气发现的投资风险评估案例研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The first part of the paper considers the basic principles of geological risk calculation (POS) based on regional geological analysis. It includes estimation of expected value for outlined potential hydrocarbon discoveries, and eventually calculation of so called 'risk money for available company budget. The described methodology of geological probability calculation is often applied and adapted for characteristic geological settings in different petroleum provinces around the world. It was tailored and validated for a comprehensive input dataset collected in the petroleum province of the Bjelovar Sub-Basin, adapted by dividing up geological events into five probability classes as follows: 1.00 for proven, 0.75 for highly reliable, 0.50 for fairly reliable, 0.25 for unreliable and 0.05 for an undefined event. The methodology is applied to evaluate a potential hydrocarbon discovery of 200,000 m (1,258,000 barrels) of recoverable oil in the analyzed area. The POS of the potential discovery is 28.48% (in Paleozoic-Middle Miocene play). The second part considers the calculation of net present value for the size of potential discovery, which is 13.52 million USD. The investment risk for such a prospect (in mentioned play) was evaluated by using an exponential utility function based on the company 's budget of 50 million USD. The amount of 850,000 risk-neutral dollars is calculated as the certain equivalent to be invested into potential discovery of the expected value of 2.42 million USD. The presented methodology could be easily applied to other Croatian parts of the Pannonian Basin System.
机译:本文的第一部分考虑了基于区域地质分析的地质风险计算(POS)的基本原理。它包括概述潜在的潜在油气发现的预期价值,以及最终计算可用公司预算中所谓的“风险金”。所描述的地质概率计算方法经常被应用并适应于世界各地不同石油省份的特征地质环境。它针对在Bjelovar次流域的石油省收集的综合输入数据集进行了量身定制和验证,并通过将地质事件划分为五个概率类别进行了调整,如下所示:1.00证实,0.75高度可靠,0.50相当可靠,0.25对于不可靠的事件为0.05,对于未定义的事件为0.05。该方法适用于评估分析区域中200,000 m(1,258,000桶)可采石油的潜在油气发现。潜在发现的POS为28.48%(古生代-中新世中期)。第二部分考虑潜在发现规模的净现值计算,即1 352万美元。根据公司的5000万美元预算,使用指数效用函数评估了这种潜在客户的投资风险(在上述情况下)。计算了850,000美元的风险中性美元,作为将等值投资于潜在发现的预期价值242万美元的等值货币。所提出的方法可以很容易地应用于潘诺尼亚盆地系统的其他克罗地亚部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号