首页> 外文期刊>International Journal of Applied Engineering Research >Some Thoughts on Variation of Response according to Longitudinal Track-Bridge Interaction Analysis Methods
【24h】

Some Thoughts on Variation of Response according to Longitudinal Track-Bridge Interaction Analysis Methods

机译:纵向道桥相互作用分析方法对响应变化的一些思考

获取原文
获取原文并翻译 | 示例
       

摘要

Additional axial stress of the rail and displacement are induced by the influence of the track-bridge interaction when the CWR (Continuous Welded Rail) track is constructed on the bridge. That is the main cause of the restriction of length of bridge deck and an increase in the construction cost. And the track-bridge interaction analysis is performed in order to examine the influence of the interaction. Two analysis methods are proposed in UIC 774-3R according to whether the loading history is considered or not. In this paper, the fundamental study was carried out for inducing an economic design of the railway bridge applying the proper analysis methods. For this purpose, track-bridge interaction analysis was performed on various types of bridges and the variation of response according to each analysis method was analyzed by comparing and analyzing the interaction analysis results.
机译:当在桥梁上建造CWR(连续焊接轨道)轨道时,轨道与桥梁相互作用的影响会引起轨道的附加轴向应力和位移。这是限制桥面板长度和增加建造成本的主要原因。并进行了轨桥相互作用分析,以检验相互作用的影响。根据是否考虑了装载历史,UIC 774-3R中提出了两种分析方法。本文对采用适当的分析方法进行铁路桥梁的经济设计进行了基础研究。为此,对各种类型的桥梁进行了轨桥相互作用分析,并通过比较和分析相互作用分析结果来分析每种分析方法的响应变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号