【24h】

Belt Replacement at a Long istance Pipe Conveyor

机译:长距离管道输送机上的皮带更换

获取原文
获取原文并翻译 | 示例
           

摘要

When the Arch Western Coal Skyline Mine, located near Helper (UT), USA, decided to replace the belt of its pipe conveyor BC-8, it awarded the contract to design, manufacture, supply and replace the existing belt and commission the new belt to ContiTech Conveyor Belt Group, Germany. A special challenge was to design the new pipe belt to be suitable to the existing routing of BC-8, and to minimise downtime due installation and commissioning. During commissioning and after break-in, the company also carried out power measurements.
机译:当位于美国Helper(UT)附近的Arch Western Coal Skyline煤矿决定更换其管道输送机BC-8的皮带时,它授予了设计,制造,供应和更换现有皮带的合同,并委托了新皮带到德国ContiTech输送带集团。一个特殊的挑战是设计新的管道输送带以适合BC-8的现有工艺路线,并最大程度地减少因安装和调试而导致的停机时间。在调试期间和磨合后,该公司还进行了功率测量。