Saving time on your electrical installations: SPEED UP INSTALLATIONS USING PRE-ASSEMBLED AND POPULATED ELECTRICAL ENCLOSURES

机译:节省电气安装时间:使用预先组装和安装的电气外壳加快安装速度

获取原文
获取原文并翻译 | 示例
           

摘要

Increasing cost pressure on electrical contractors has undoubtedly led to time saving products and services being of more interest. One aspect that is often overlooked and can add hours to any job is the preparation, assembly and population of electrical junction boxes and enclosures. Most junction boxes or enclosures carrying basic termination and electrical protection equipment will require cable entries to be made, and DIN rail or bus bar and internal equipment to be mounted. This alone can take between 20 minutes and a couple of hours, depending on the size and complexity of the unit. Applications with slightly out of the ordinary requirements such as non-standard cable entries, warning lights, e-stops, internal components that have to be wired and tested, or any number of other possibilities all require some form of on-site drilling, milling, assembly or commissioning. This can take hours and require specialist equipment and knowledge and is potentially therefore extremely costly.
机译:毫无疑问,对电气承包商的成本压力越来越大,导致节省时间的产品和服务引起了更多关注。通常会忽视并且可能增加工作时间的一个方面是电气接线盒和外壳的准备,组装和组装。大多数带有基本终端和电气保护设备的接线盒或外壳都需要进行电缆引入,并需要安装DIN导轨或母线和内部设备。仅此一项就可能需要20分钟到几个小时,具体取决于设备的大小和复杂性。稍有不同寻常的要求的应用,例如非标准电缆入口,警告灯,急停开关,必须进行接线和测试的内部组件或任何其他可能性,都需要某种形式的现场钻孔,铣削,组装或调试。这可能需要几个小时,并且需要专业的设备和知识,因此潜在地成本很高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号