首页> 外文会议>Iron and Steel Technology Conference >Nucor Gallatin Pre-Assembled Tunnel Furnace: Meeting the Demand of Quality Construction With Saving in Installation Time
【24h】

Nucor Gallatin Pre-Assembled Tunnel Furnace: Meeting the Demand of Quality Construction With Saving in Installation Time

机译:Nucor Gallatin预组装隧道炉:满足质量建设的需求,以节省安装时间

获取原文

摘要

In a market where time is money and any rework at site may cost a fortune and delay the overall completion, the "preassembly" concept has become a necessity. Danieli Centro Combustion is executing a pre-assembled tunnel furnace for Nucor Steel Gallatin. The whole assembly of furnace equipment (structure, refractory, piping) is done in the workshop prior to shipment at site. 3D engineering by Danieli Centro Combustion and pre-assembly are mutually beneficial concepts that will ensure no additional time from order to commissioning and add the benefits of quality, workmanship and accuracy long desired by industry for turnkey projects.
机译:在一个时代的市场和现场任何返工的市场中可能会花费财富和延迟整体完成,“预报”的概念已成为必需品。 Danieli Centro燃烧正在为Nucor Steel Gallatin执行预先组装的隧道炉。 炉设备(结构,耐火材料,管道)的整个组装在现场发货前在车间完成。 3D工程由Danieli Centro燃烧和预组装是互利的概念,将不再需要额外的时间来调试,并增加行业所需的特质,制作和准确性的效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号