首页>
外国专利>
Tunnel construction process recording device and tunnel cycle time management device, tunnel construction process recording method and tunnel cycle time management method
Tunnel construction process recording device and tunnel cycle time management device, tunnel construction process recording method and tunnel cycle time management method
To provide a tunnel construction process recording device and a tunnel cycle time management device to record real-time information based on an actual tunnel construction process without any intervention by personal.SOLUTION: A management device 10 comprises: an information acquisition section 11 acquiring in time sequence electricity consumption information corresponding to consumption of each device or a group of equipment from power source units of a plurality of devices used in a tunnel construction; a process determination section 12 determining a corresponding tunnel construction process through analyzing the electricity consumption information acquired in time sequence with the information acquisition section 11; and a storage section 13 recording information based on the tunnel construction process determined by the process determination section 12.SELECTED DRAWING: Figure 2
展开▼